Work instructions for live working

An additional service of ours is the development of work instructions and work orders for live working.
Down below you can find an overview of some of our work instructions.

We can deliver the work instructions in a printed form and on CD-ROM.

Overview of some of our valid work instructions for live working

Basic instruction low voltage

Description No. of work instruction
Basic instruction low voltage AW-LV 1

Live cable work

Description No. of work instruction
Cutting of oil-paper insulated cables N(A)KBA AW-LV 2/01
Cutting of plastic cables with Ceander outer conductor N(A)YCWY AW-LV 2/02
Assembly of insulating cable end joints for oil-paper insulated cables N(A)KBA AW-LV 2/03
Assembly of branch tees for oil-paper insulated cables N(A)KBAwith separated terminals in insulating box AW-LV 2/04
Assembly of branch tees for plastic cables N(A)YY with clamping ring AW-LV 2/05
Assembly of insulating wire end joints for plastic cables N(A)YY AW-LV 2/06
Assembly of shrink joints for plastic cables N(A)YY with bolted connections AW-LV 2/07
Cutting of plastic cables N(A)YY AW-LV 2/08
Assembly of shrink joints for plastic cables N(A)YY AW-LV 2/09
Assembly of transition joints from oil-paper insulated cables N(A)KBA to plastic cables N(A)YY with shrink technology AW-LV 2/10
Assembly of branch tees plastic cables with Ceander outer conductor N(A)YCWY (three conductor cable) with clamping ring AW-LV 2/11
Assembly of transition joints from oil-paper insulated cables N(A)KBA to plastic cables N(A)YY in insulating box AW-LV 2/12
Assembly of shrink joints for plastic cables with Ceander outer conductor N(A)YCWY with bolted connections AW-LV 2/13
Assembly of transition joints from oil-paper insulated cables N(A)KLEY to plastic cables N(A)YY with shrink technology AW-LV 2/14
Assembly of branch tees for oil-paper insulated cables N(A)KLEY with clamping ring AW-LV 2/15
Assembly of transition joints from oil-paper insulated cables N(A)KLEY to plastic cables N(A)YY in insulating box AW-LV 2/16
Assembly of branch tees for oil-paper insulated cables N(A)KBA with clamping ring AW-LV 2/17
Assembly of shrink joints for plastic cables with concentric outer conductor NAYFaY AW-LV 2/18
Assembly of shrink joints for plastic cables with Ceander outer conductor N(A)YCWY with crimp connectors AW-LV 2/19
Check zero-potential at oil-paper insulated cables N(A)KBA AW-LV 2/20
Check zero-potential at plastic cables N(A)YY AW-LV 2/21
Cutting of oil-paper insulated cables N(A)KLEY with Aluminium sheath AW-LV 2/22
Cutting of plastic cables with concentric outer conductor NAYFaY AW-LV 2/23
Assembly of insulating cable end joints for plastic cables with Ceander outer conductor N(A)YCWY AW-LV 2/24
Assembly of insulating cable end joints for oil-paper insulated cables N(A)KLEY with Aluminium sheath in insulating box AW-LV 2/25
Assembly of insulating cable end joints for plastic cables with concentric outer conductor NAYFaY AW-LV 2/26
Assembly of branch tees for plastic cables with concentric outer conductor NAYFaY with separated terminals in a insulating box AW-LV 2/27
Assembly of branch tees for oil-paper insulated cables N(A)KLEY with separated terminals in a insulating box AW-LV 2/28

Work on switchgear

Description No. of work instruction
Replacement of fuse devices AW-LV 3/01
Connect and reconnect of cable and wires in LV-switchgear AW-LV 3/02
Replace of house supply boxes AW-LV 3/03
Replace of LV strip-type fuseways and strip-type fuse-disconnectors AW-LV 3/04
Dry cleaning of LV-switchgear AW-LV 3/05
Retightening of bolted connections in LV-switchgear AW-LV 3/06
Remove of scaled contacts at strip-type fuseways AW-LV 3/07
Upgrading busbars at LV-switchgear AW-LV 3/08
Wet cleaning of LV-switchgear AW-LV 3/09

Work at overhead lines (OHL)

Description No. of work instruction
Assembly and disassembly of overhead line house supplies at branch pylons AW-LV 4/01
Assembly and disassembly of house supply cables and air cables (isolated overhead lines) AW-LV 4/02
Assembly and disassembly from cables on overhead lines at pylons AW-LV 4/03
Assembly of insulation for building activities AW-LV 4/04
Assembly and disassembly of temporary power supply devices AW-LV 4/05
Assembly and disassembly of branch fuses AW-LV 4/06
Assembly and disassembly of surge arresters AW-LV 4/07
Open and close of bridging lines at branch pylons AW-LV 4/08
Repair of damaged wires of overhead lines AW-LV 4/09
Maintenance and replace of defect disconnector contacts AW-LV 4/10
Release and assembly of cross tie while changing wooden pylons AW-LV 4/11
Replace of insulators and supports at pylons and roofs AW-LV 4/12
Assembly and disassembly of house supplies with isolated OHL wires NFA2X AW-LV 4/13

Work at metering systems

Description No. of work instruction
Work at metering and accessory systems AW-LV 5/01
Work at LV electric meter and instrument transformer systems AW-LV 5/02
Technical locking of house supplies AW-LV 5/03

Work at measurement and control technology systems

Description No. of work instruction
Work at terminal strips AW-LV 6/01
Assembly and disassembly of devices with bolted connection interface AW-LV 6/02
Release and assembly of wire connections at support busbars AW-LV 6/03
Temporary connection of measurement devices AW-LV 6/04

Work at street lighting installation

Description No. of work instruction
Connect and reconnect of cables in transition and fuse boxes AW-LV 7/01
Assembly and disassembly of switchboards in cubicles AW-LV 7/02
Assembly of shrink joints for plastic cables N(A)YY with bolted connections AW-LV 7/03

Work at electric installations

Description No. of work instruction
Work at electric installations AW-LV 11

Work at battery and DC systems

Description No. of work instruction
Replace of batteries AW-LV 12/01
Connect and reconnect of DC cables and wires AW-LV 12/02

Basic instruction medium voltage cleaning and maintenance

Description No. of work description
Dry cleaning of indoor equipment up to 36 kV AW-HV 3/01
Damp cleaning of indoor equipment up to 36 kV AW-HV 3/02
Refilling of oil terminations up to 36 kV AW-HV 3/03
Maintenance of switching devices up to 36 kV AW-HV 3/04
Creating by-pass for 24 kV switching devices with BSD jumpering system AW-HV 3/05
Inspection of non-view-able parts with BSD insulating camera AW-HV 3/06
Creating by-pass for 12 kV switching devices with BSD jumpering system AW-HV 3/07

Basic instruction medium voltage hot stick method overhead line

Description No. of work instruction
Assembly and Disassembly of short-circuit indicators AW-HV 4/01
Mounting and removing of bird protection caps AW-HV 4/02
Mounting and removing of BSD perch rejectors AW-HV 4/03

Basic instruction medium voltage work with insulating gloves

Description No. of work instruction
Assembly and disassembly of supporting insulators at the pole MSFL 2/01
Assembly and disassembly of supporting insulators in double support variant at the pole MSFL 2/02
Modification from single support to double support construction at the pole MSFL 2/03
Assembly and disassembly of tension insulators at the pole MSFL 2/04
Assembly and disassembly of suspension insulators at the pole MSFL 2/05
Modification from supporting insulator to suspension insulator construction at the pole MSFL 2/06
Opening and closing of current bridges at the pole MSFL 2/07
Assembly and disassembly of bird protection caps with insulating gloves MSFL 2/09
Removal of foreign objects from poles with supporting insulator construction MSFL 2/10
Repairing of conductor damages MSFL 2/11
Assembly and disassembly of disconnectors MSFL 2/12
Draft(Changing of wooden poles with supporting insulators and T-type traverse MSFL 2/15
Covering for work at non-active parts MSFL 2/17
Changing of wooden poles with suspension insulators and T-type traverse MSFL 2/19
Changing of wooden poles with vertically offset supporting insulators MSFL 2/20
Changing of wooden poles with vertically offset suspension insulators MSFL 2/21